We had to remove the existing Copper stills through a window as we had no roof access,this was carried out at night as we were using a public carpark,we had access between 1am & 5am.
We removed the old stills,we then installed the 2 new stills putting them in through the window using a 20 tonne fork truck,with only 25mm clearance each side.
We had 10 days to remove the existing stills,install the new stills,attach the Lyne arms,condensers & Spirit safes,install new pipe work & Brass Manways.